Accenture Task Presentation 3

Introduction 

Title: Waterfall vs. Agile Methodologies in House Construction

Subtitle: Applying Software Development Principles to Real-world Projects

Waterfall Methodology for House Construction

 Requirements Definition:

  • Clearly defined specifications for house size, layout, materials, and features upfront.

 Planning:

  • Sequential planning with detailed construction schedule.
  • Task dependencies identified before starting construction.

 Design:

  • Detailed architectural plans based on defined requirements.
  • Materials, structural design, and interior layout determined in advance.

 Build:

  • Phases completed sequentially (foundation, framing, roofing, interior).
  • Each phase finished before moving to the next.

Test:
  • Inspections and quality checks at end of each phase.
  • Final inspection for compliance with building codes and safety standards.
Advantages:
  • Well-defined scope and plan minimize scope changes.
  • Predictable timeline and budget.
  • Detailed design ensures clear vision of final product.
Impacts on House Construction:
  • Sequential phases may lead to longer development time.
  • Late changes can be costly and time-consuming.
  • Best suited for projects with stable requirements.
                                                                       
Agile Methodology for House Construction 

 Requirements Definition:

  • Initial requirements gathered with focus on high-level objectives and flexibility.

 Planning:

  • Continuous planning and reevaluation as project progresses.
  • Tasks prioritized based on evolving homeowner preferences.

 Design:

  • Basic design initially, with flexibility for adjustments.
  • Incorporating changes based on homeowner feedback.

 Build:

  • Modular and iterative construction, allowing incremental development.
  • Individual rooms or sections completed separately based on priority.

Test:

  • Frequent inspection and quality checks after each phase.
  • Homeowner feedback incorporated into ongoing construction.

Advantages:

  • Flexibility to adapt to changing homeowner preferences.
  • Early delivery of functional features for quick feedback.
  • Continuous homeowner involvement for high satisfaction.

Impacts on House Construction:

  • Changes accommodated during construction.
  • Faster delivery of usable portions (incremental completion).
  • Homeowner involvement leads to personalized final product
Considerations and Conclusion

 Choosing the Right Approach:
  • Waterfall: Stable requirements, detailed planning.
  • Agile: Evolving preferences, flexibility.
 Tailoring the Methodology:
  • House construction parallels SDLC phases.
  • Selection based on homeowner priorities and project complexity.
 Conclusion 
  • Both methodologies offer distinct benefits.
  • Decision based on homeowner preferences and project characteristics.